Hostname: page-component-848d4c4894-m9kch Total loading time: 0 Render date: 2024-06-01T11:44:26.685Z Has data issue: false hasContentIssue false

A Performance Management Solution: Productivity Measurement and Enhancement System (ProMES)

Published online by Cambridge University Press:  21 April 2015

Anne Scaduto*
Affiliation:
Federal Management Partners, Inc., Alexandria, Virginia
Brendan Hunt
Affiliation:
Federal Management Partners, Inc., Alexandria, Virginia
Daniel Schmerling
Affiliation:
Federal Management Partners, Inc., Alexandria, Virginia
*
Correspondence concerning this article should be addressed to Anne Scaduto, Federal Management Partners, Inc., 1500 North Beauregard Street, Suite 103, Alexandria, VA 22311. E-mail: scadoots@gmail.com

Extract

Pulakos, Mueller Hanson, Arad, and Moye (2015) have stated that performance management (PM) best practices have resulted in the dissatisfaction of employees and managers with PM reviews and systems. The authors have suggested that the focus should be on driving critical PM behaviors that have been shown to increase engagement and performance. Corporate Leadership Council (2004) research demonstrated that increased engagement takes place when PM behaviors such as setting clear expectations, providing regular feedback, and helping employees develop and succeed occur. In addition, effective PM happens when employees are contributing to the process as well.

Type
Commentaries
Copyright
Copyright © Society for Industrial and Organizational Psychology 2015 

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

References

Campbell, J. P. (2012). [Back cover]. In Pritchard, D., Weaver, S. J., & Ashwood, E. L. (Eds.), Evidence-based productivity improvement: A practical guide to the Productivity Measurement and Enhancement System (ProMES). New York, NY: Routledge.Google Scholar
Cohen, J. (1969). Statistical power analysis for the behavioral sciences. New York, NY: Academic Press.Google Scholar
Corporate Leadership Council. (2004). Driving employee performance and retention through engagement: A quantitative analysis of the effectiveness of employee engagement strategies (Catalog No. CLC12PV0PD). Washington, DC: Corporate Executive Board.Google Scholar
Janssen, P., van Berkel, A., & Stolk, J. (1995). ProMES as part of a new management strategy. In Pritchard, R. D. (Ed.), Productivity measurement and improvement: Organizational case studies (pp. 4361). New York, NY: Praeger.Google Scholar
Latham, G. (2012). [Back cover]. In Pritchard, R. D., Weaver, S. J., & Ashwood, E. L. (Eds.), Evidence-based productivity improvement: A practical guide to the Productivity Measurement and Enhancement System (ProMES). New York, NY: Routledge.Google Scholar
Naylor, J. C., Pritchard, R. D., & Ilgen, D. R. (1980). The theory of behavior in organizations. New York, NY: Academic Press.Google Scholar
Paquin, A. R., Jones, S. D., & Roth, P. L. (1992, April). The Hawthorne Effect when evaluating productivity gains. Paper presented at the 7th Annual Conference of the Society for Industrial and Organizational Psychology, Montreal, Quebec, Canada.Google Scholar
Pritchard, R. D. (1990). Measuring and improving productivity: A practical guide. New York, NY: Praeger.Google Scholar
Pritchard, R. D. (Ed.). (1995). Productivity measurement and improvement: Organizational case studies. New York, NY: Praeger.Google Scholar
Pritchard, R. D., & Ashwood, E. L. (2008). Managing motivation: A manager's guide to diagnosing and improving motivation. New York, NY: Routledge.Google Scholar
Pritchard, R. D., Harrell, M. M., DiazGranados, D., & Guzman, M. J. (2008). The productivity measurement and enhancement system: A meta-analysis. Journal of Applied Psychology, 93, 540567. doi:10.1037/0021-9010.93.3.540Google Scholar
Pritchard, R. D., Weaver, S. J., & Ashwood, E. L. (2012). Evidence-based productivity improvement: A practical guide to the Productivity Measurement and Enhancement System (ProMES). New York, NY: Routledge.Google Scholar
Pritchard, R. D., Young, B., Koenig, N., Schmerling, D., & Wright, N. (2013). Long term goals and the productivity measurement and enhancement system. In Locke, E. A. & Latham, G. P. (Eds.), New developments in goal setting and task performance (pp. 233245). New York, NY: Routledge.Google Scholar
Pulakos, E. D., Mueller Hanson, R., Arad, S., & Moye, N. (2015). Performance management can be fixed: An on-the-job experiential learning approach for complex behavior change. Industrial Organizational Psychology: Perspectives on Science and Practice, 8, 5176.Google Scholar