Introduction
It is widely recognized that natural ecosystems produce a broad range of environmental services (Daily, 1997; Balmford et al., Reference Balmford, Bruner, Cooper, Costanza, Farber and Green2002; MEA, 2005), including carbon sequestration by forests, regulation of water quantity and quality, scenic beauty and biodiversity. The failure of society to compensate land managers for the provision of these services is regarded as a key factor contributing to rapid changes in land use, in particular the global degradation of ecosystems (Butchart et al., Reference Butchart, Walpole, Collen, Van Strien, Scharlemann and Almond2010).
Payments for ecosystem services (PES) has been proposed as one way to deliver better conservation by financially linking beneficiaries of an ecological service back to the people who manage the resource that provides the service (Ferraro, Reference Ferraro2001; Ferraro & Kiss, Reference Ferraro and Kiss2002; Wunder, Reference Wunder2007, Reference Wunder2008; Pagiola, Reference Pagiola2008; Wunder et al., Reference Wunder, Engel and Pagiola2008; Clements et al., Reference Clements, John, Nielsen, An, Tan and Milner-Gulland2010; Pattanayak et al., Reference Pattanayak, Wunder and Ferraro2010). PES schemes have been defined as a voluntary transaction in which a well-defined ecosystem service (or corresponding land use) is ‘bought’ by a minimum of one ecosystem service buyer from a minimum of one ecosystem service provider if, and only if, ecosystem service provision is secured (conditionality). As it is often hard to provide reliable measures for ecosystem services, proxies based on changes in land use or management are often used. Failure to fulfil all criteria results in some approaches being termed PES-like schemes (Wunder, Reference Wunder2005a,b). Existing PES schemes include those where payments are made for ecological tourism (Clements et al., Reference Clements, John, Nielsen, An, Tan and Milner-Gulland2010), water provision (Dudley & Stolton, Reference Dudley and Stolton2003; Asquith et al., Reference Asquith, Vargasa and Wunder2008; Muñoz-Piña et al., Reference Muñoz-Piña, Guevara, Torres and Braña2008; Pagiola, Reference Pagiola2008; Wunder & Albán, Reference Wunder and Albán2008), forest carbon (REDD+ mechanisms; Burgess et al., Reference Burgess, Bahane, Clairs, Danielsen, Dalsgaard and Funder2010a; Clements, Reference Clements2010), pollination of crops (Ricketts, Reference Ricketts2004) and delivery of biodiversity outcomes (Clements et al., Reference Clements, John, Nielsen, An, Tan and Milner-Gulland2010; Sommerville et al., Reference Sommerville, Jones, Rahajaharison and Milner-Gulland2010; Gross-Camp et al., Reference Gross-Camp, Martin, McGuire, Kebede and Munyarukaza2011).
PES schemes, by definition, use the direct payments approach of cash payments to individuals, as advocated by Ferraro & Kiss (Reference Ferraro and Kiss2002). Research suggests that, when compared with indirect conservation approaches, direct payments within PES schemes are (1) institutionally simpler, (2) more cost-effective in delivering benefits to buyers, (3) more effective in generating economic growth among suppliers by improving cash flow, diversifying income sources, and reducing income variance, and (4) provide new sources of finance for conservation (Ferraro, Reference Ferraro2001; Ferraro & Kiss, Reference Ferraro and Kiss2002; Pattanayak et al., Reference Pattanayak, Wunder and Ferraro2010). However, some have argued that direct payments are also institutionally complex to implement in poor communities with insecure land tenure and weak institutions, and favour other, non-PES, approaches to providing collective benefits, such as schools and health clinics (Leimona et al., Reference Leimona, Joshi and Van Noordwijk2009; Milne & Niesten, Reference Milne and Niesten2009). Evidence for the impact of both approaches is limited.
Market-based implementation of PES schemes is occurring in parts of Latin America and South-East Asia (Pattanayak et al., Reference Pattanayak, Wunder and Ferraro2010), with somewhat mixed results. In Africa most PES schemes are in the pilot stage and heavily supported by donors and NGOs, are not yet self sustaining financially or technically (Ferraro, Reference Ferraro2009), and lack adequate monitoring mechanisms to ensure compliance. PES schemes in Africa that lack conditionality and monitoring mechanisms to ensure the ecosystem service is delivered are operationally similar to integrated conservation and development projects whose initial popularity ended when expensive pilot projects were shown to deliver few conservation or livelihoods benefits, and sustainability proved elusive (Ferraro & Kiss, Reference Ferraro and Kiss2002; McShane & Wells, Reference McShane and Wells2004; Burgess et al., Reference Burgess, Thomas, Mhagama, Lehmberg, Springer, Barnard, Lovett and Ockwell2010b; Clements et al., Reference Clements, John, Nielsen, An, Tan and Milner-Gulland2010).
We present a case study of a pilot water PES project in the Uluguru Mountains of Tanzania (Fig. 1a) and trace its development, operationalization, outline the payment mechanism, and discuss the likelihood of it achieving sustainability. We also use a proposed PES and poverty alleviation framework (Wunder, Reference Wunder2008) to explore the extent that poor people are able to participate in this PES scheme as buyers or sellers of environmental services. The lessons learned from this project are relevant to promoting the emerging market-based conservation approach more broadly in tropical Africa.
Study area
The Eastern Arc Mountains are in eastern Africa, mostly in Tanzania (Fig. 1a). The summits of these steep mountains are tropical cloud forest, lying within a network of reserves (Hall et al., Reference Hall, Burgess, Lovett, Mbilinyi and Gereau2009) that support globally important biodiversity with many endemic and threatened species (Burgess et al., Reference Burgess, Butynski, Cordeiro, Doggart, Fjeldså and Howell2007). Hydrologically these mountains are of critical importance. Water flows from the forests throughout the year and provides services to millions of people, including c. 60% of Tanzania's electricity generation, and drinking water for at least 20% of the human population, >80% of Tanzanian industry, and much of the irrigated agriculture (Ministry of Finance and Economic Affairs, 2008; Fisher et al., Reference Fisher, Kulindwa, Mwanyoka, Turner and Burgess2010, Reference Fisher, Turner, Balmford, Burgess, Green and Kajembe2011). Most of the benefits from this water are realized far from the catchment forests where the water originates.
The Uluguru Mountains (200–2,638 m altitude) form the major catchment to the Ruvu River and are c. 200 km inland (Fig. 1b). Total annual rainfall is 1,000–3,000 mm. As altitude increases the vegetation changes from miombo woodlands and coastal and transitional rainforests to submontane, montane and upper montane forests. The area includes an area of Afromontane grasslands on the Lukwangule Plateau. The submontane to upper montane forests and grasslands lie within the 72,000-ha Uluguru Nature Reserve (Fig. 1b). These habitats are rich in endemic species and of high conservation priority (Burgess et al., Reference Burgess, Doggart and Lovett2002, 2007). Over 150,000 people live within the mountain area and human density is greater at higher altitudes, with farmland up to the Nature Reserve boundary.
CARE International and WWF Tanzania have been implementing the Equitable Payments for Watershed Services (EPWS) project since 2005. This project emphasizes the fair and equitable distribution of benefits accruing from the sale of ecosystem services to downstream users, and is centred on the Kibungo sub-catchment in the south-eastern Uluguru Mountains (Fig. 1c; Branca et al., Reference Branca, Lipper, Neves, Lopa and Mwanyoka2009). Funding to establish the mechanism has been provided by the Danish and Dutch Governments, totalling c. EUR 1.3 million.
The first phase of the EPWS (2005–2007) comprised a feasibility assessment, a series of consultancies to establish the baseline, the formulation of an outline business case, and the signing of memoranda of understanding with potential service buyers. The second phase (2008–2012) has established water PES on a pilot scale, engaging four communities and two downstream water users. A proposed third phase, where local stakeholders own the project after the exit of foreign donors (Directorate General for International Cooperation (DGIS) of the Netherlands, Danish International Development Agency (DANIDA)) and managers (CARE International, WWF), will emphasize sustainability and scale up the programme to include 50–75 communities across the Uluguru Mountains. Phase three is contingent upon long-term legally binding contracts being signed between buyers and sellers and the development of a full business case and strategy for programme expansion to new sub-catchments.
Environmental challenges in the Uluguru Mountains
The Uluguru Mountains receive rainfall every month and this supports year-round crop production. However, decades of inappropriate land use have resulted in erosion and nutrient exhaustion of the soils and led to declines in crop productivity (Lyamuya et al., Reference Lyamuya, Noah, Kilasara, Kirenga and Burgess1994; Hartley & Kaare, Reference Hartley and Kaare2001; Branca et al., Reference Branca, Lipper, Neves, Lopa and Mwanyoka2009; Harrison et al., Reference Harrison, Leimona and Van Noordwijk2010). Large areas of bracken fern Pteridium aquilinum growing in the farmlands of the study area indicate the poor nutrient status of the soil (Nsenga, Reference Nsenga2009). Social surveys of 83 households in 2007 show that 89.2% of villagers are subsistence farmers with no more than 1 ha of land, low levels of education (66.7% with only primary education), living in mud houses with thatch roofs, and with almost no land title deeds (CARE/WWF, 2007). Cash income levels are unknown but are certainly low (Harltey & Kaare, Reference Hartley and Kaare2001; CARE/WWF, 2007; CARE & WWF, unpubl. data). A pre-requisite for site selection was the livelihood status of farming communities, as they had to be at, or below, the poverty line.
A marked decline in dry season water flow over the past 53 years has been recorded on the Ruvu River at the offtake for the Dar es Salaam water supply (Fig. 2a). Over a similar time period (1933–2004) there is no appreciable change in dry season rainfall (Fig. 2b). However, analysis of forest cover in the Uluguru range (Mbilinyi et al., Reference Mbilinyi, Malimbwi, Shemwetta, Songorwa, Zahabu, Katani and Kashaigili2006; Hall et al., Reference Hall, Burgess, Lovett, Mbilinyi and Gereau2009) suggests that the decrease in water flow is probably a result of forest reduction (from 338 to 279 km2 during 1955–2000; Fig. 2c), combined with increased offtake for agriculture and urban use. Forest reduction has been driven by the expansion of agricultural areas into the forest land, and degradation of the forest from cutting of timber for building poles and firewood (Frontier-Tanzania, Reference Bracebridge, Fanning, Howell, Rubio and St John2005; Madoffe & Munishi, Reference Madoffe and Munishi2005, Reference Madoffe and Munishi2010; Mbilinyi et al., Reference Mbilinyi, Malimbwi, Shemwetta, Songorwa, Zahabu, Katani and Kashaigili2006). Despite a lack of firm evidence, land-use changes have probably affected the hydrological regime in the Ruvu Basin, and human population growth and greater use of irrigation will have increased water use (Mtalo, Reference Mtalo2005; Yanda & Munishi, Reference Yanda and Munishi2007).
Data on water turbidity in the Ruvu River at the extraction point for Dar es Salaam's water supply shows an increase over a 10-year period (Fig. 2d). Between 1992 and 2003 turbidity increased at an average of 5 nephelometric turbidity units (NTU, a measure of the suspended material in water) per year, with turbidity values of 100–200 NTU towards the end of the decade. The standard for drinking water is normally set at one NTU, with water of 10 NTU interfering with, or damaging, treatment filters, which can result in intake closures at drinking-water facilities. As a consequence, the Dar es Salaam Water and Sewerage Cooperative (DAWASCO) is experiencing year-on-year increases in water treatment costs.
To address these issues the Tanzanian government has developed the policy foundation for watershed PES in Tanzania, partly building on earlier consultancy studies (Kulindwa, Reference Kulindwa2005; Mwanyoka, Reference Mwanyoka2005; Kulindwa et al., Reference Kulindwa, Msambichaka, Lokina, Hepelwa, Mngodo and Swai2006). The Water Resources Management Act (2009), paragraph 96 (p. 406) states that ‘Water Basin Boards may announce charges with respect of “payments for environmental services” ’. Instruments for economic incentives are also found in the Environmental Management Act Cap 191 of 2009. The policy has yet to be implemented on any meaningful scale and this article is the first to explore the potential of such interventions.
Methods
The team writing this article comprises the project managers (the first two authors), consultants who have advised or appraised the project (the next set of authors), and a semi-independent academic who has worked in the Ulugurus for many years but who has not been directly involved in implementing this project (last author). The team reviewed all project documentation, various consultant reports, background information on the site and other water PES projects in Africa and globally, and visited the field site on several occasions. As this project has been established within the previous 5 years the monitoring systems to measure outcomes for people and the environment have only been operational for a few years, and hence attributing changes to the project's activities has proven difficult. However, as this is a key deliverable for the pilot project, we discuss it further later.
Given the specific focus of the EPWS on achieving equitable outcomes, we used a framework (Wunder, Reference Wunder2008) to evaluate the potential of this programme to reduce rural poverty:
• Participation filters: to what extent do poor people participate in PES schemes as buyers and sellers of environmental services?
• Effects on sellers: if the poor become service sellers does this have any positive effect on their income?
• Effects on users: do poor service buyers (and non-paying poor service users) become better off from their involvement in PES?
• Derived effects: how are other, non-participant poor affected by PES outcomes?
We also evaluated the degree to which non-income benefits have been produced through engagement in the PES scheme.
Results
Programme progress and impacts
An initial set of baseline studies assessed hydrological and land uses (Yanda & Munishi, Reference Yanda and Munishi2007), livelihoods (CARE/WWF, 2007) and erosion hotspots within the landscape (Gathenya, Reference Gathenya2009). The project also mapped land use and ownership and characteristics of farm plots in the project area. Monitoring water flow and quality began in March 2010 with the installation of two stations to measure river flow and one automatic weather station, and more detail on livelihoods impacts are being assessed in 2011.
The EPWS programme comprises a project unit in Morogoro and an intermediary group composed of influential government officers in Dar es Salaam. Together, they have prepared business cases for companies in Dar es Salaam, negotiated memoranda of understanding with two major water users in the city, and developed the mechanism for disbursing funds. The two water users are the Dar es Salaam Water Company (DAWASCO) that currently spends nearly USD 2 million per year on water treatment, and Coca Cola Kwanza Limited (CCKL) that is dependent on DAWASCO for approximately 1,500 m3 of water per day.
At the operational level the EPWS structure (Fig. 3) comprises an agreement between CARE Tanzania and four village authorities (Kibungo, Nyingwa, Lanzi and Dimilo; total population 4,860) where CARE is the intermediary agent of DAWASCO. Village authorities agree to implement and maintain a set of specified soil conservation measures and to pass payments from CARE to participating farmers. In return, CARE agrees to make payments on behalf of DAWASCO according to the work done by farmers. Additionally, CARE provides materials to implement soil conservation measures and makes an annual payment of USD 1.50 for each acre (USD 0.6 per ha) of land under improved land-use practice. These funds are used to purchase materials to facilitate communication, namely stationery and mobile phone credit. Contract negotiations were undertaken at well-publicized public meetings in all villages in October 2008. Compliance is ensured through signed agreements between village authorities and CARE and regular village meetings. Records on numbers of farmers, types of measures, land areas and payment records are maintained both in the village and by the project.
The number of farmers participating in the project increased 3.5 fold within 1 year of the project's inception in July 2009 (from 144 to 544 participants), perhaps because of the financial incentives. Adoption of improved agricultural practices was initially supported by the project, and later by financial payments via the PES mechanism (Table 1). Interventions include agro-forestry, reforestation, grass strip planting and terrace development. Agroforestry intervention targeted restoration activities in the erosion hotspots, which involved planting fruit and timber trees (e.g. the exotic mango Mangifera indica, oranges Citrus sinensis, avocado Persea americana, Leucaena leucocephala, Casuarina spp. and Grevillea robusta) and the native Faidherbia albida, Khaya anthotheca (timber) and Allanblackia stuhlmannii (oil bearing fruit). However, adoption of agroforestry and other interventions is dependent on the willingness of farmers to participate and this has resulted in a patchwork of intervention sites (Fig. 1c). According to discussions with farmers and from the project team's knowledge, farmers adopt the practices primarily because they receive agricultural extension advice that is not available any other way and because they receive payments. Terrace development includes the local terrace types fanya juu (soil from trench on upper edge) and fanya chini (soil from the trench on lower edge). These two approaches are used to develop more standard bench terraces. These intervention areas are scattered across the project villages (Fig. 1c) and occupy relatively small parcels of land (Table 2).
* Terraces: bench terraces, fanya juu and fanya chini; tree planting: agroforestry and reforestation
Using funding provided by DAWASCO the project paid TZS 2.1 million (USD 1,640) in May 2010 to the initial 144 participants (Fig. 4) that had made improvements to their land management practices in 2009. Payments were made to individual farmers based on the area of different land improvement technologies applied, the labour costs and loss of income in the short term (Table 3). Opportunity costs of the land-use practices were evaluated by CARE/WWF upon consultation with discussion groups and village assemblies, and evaluation of economic returns provided by maize, beans, cassava, rice and banana, the most common crops in the Uluguru area. Each farmer received USD 8–48 according to the area of land converted to the improved farming technologies. All payments were made after verifying that the work had been done. Verification was achieved by visiting the field to see which type of technology was being implemented and measuring the area of the land with a global positioning system, with data transferred into a geographical information system. This occurs every time the project team visits the farmers in their fields. At this pilot project stage the funding from DAWASCO is in the form of corporate social responsibility; the money is provided as a grant and the company is not expecting a real change in water quality. This would only be realized if the project is scaled up and payments are contingent upon improved water quality being delivered downstream.
1Opportunity cost was calculated in consultation with community members and relates to agricultural income for main crops linked to area removed from production for each technology. This was agreed to be TZS 160,000 (USD 128) per ha.
2Communities were consulted to obtain the local labour day market price, which was TZS 1,500 (USD 1.2). This was then multiplied by number of labour days required for respective action.
Benefits to forests and biodiversity
The baselines of forest cover (Mbilinyi et al., Reference Mbilinyi, Malimbwi, Shemwetta, Songorwa, Zahabu, Katani and Kashaigili2006; Hall et al., Reference Hall, Burgess, Lovett, Mbilinyi and Gereau2009) and forest disturbance (Madoffe & Munishi, Reference Madoffe and Munishi2005) were updated in 2010 from field surveys, to assess disturbance (Madoffe & Munishi, Reference Madoffe and Munishi2010), and analysis of 2007/2008 Landsat 7 images (Mbilinyi & Kashaigili, Reference Mbilinyi and Kashaigili2010). No changes in rates of disturbance can be demonstrated over this time period but from 2000 to 2008 forest on the Uluguru Mountains declined from 279 to 263 km2 (5.5%), mainly in unprotected forest lands to the north of Uluguru Nature Reserve.
Changes in rural livelihoods
Farmers participating in the scheme received financial payments to compensate for their labour and opportunity costs (reduction in crop production; Table 3), and have used the additional money to purchase iron sheet roofing for their houses, goats for milk and manure production, and better clothes and to pay school fees. Baseline income levels in the project area were too low to make these investments (Hartley & Kaare, Reference Hartley and Kaare2001; CARE/WWF, 2007). Farmers have also used the money they have received to purchase extra agricultural inputs, namely better seeds to improve agricultural yields. In September 2010 25 farmers purchased cabbage seeds using PES funding, which allowed them to change some of their land to a new crop with higher economic value (Table 4), multiplying the livelihood impacts of the PES payments.
Potential to reduce rural poverty
Participation filters Poor people in the Uluguru Mountains have been helped to move towards selling environmental services to downstream water users. Farmers, through CARE, have sold DAWASCO the promise of improved water quality from altered farming practices, for which they have benefited financially. Most participating farmers are middle income according to local norms. Participation by poorer households may have been limited because they have less available land with which to experiment and tend to focus on core food crops for subsistence. Exclusion of the poorest people has been observed elsewhere in similar schemes (Pascual et al., Reference Pascual, Muradian, Rodriguez and Duraiappah2009).
Effects on sellers In July 2009 144 farmers had joined the scheme and were paid in May 2010 the equivalent of a total of USD 1,639 as an annual payment to compensate for their efforts to improve land management, reduce erosion and improve water quality. By May 2010 554 local farmers had become sellers in the scheme, increasing to 650 by November 2010. In July 2011 participating farmers were paid a total of USD 11,000 for their efforts to improve land. As new people are still joining the scheme the expected payment in 2012 will be higher. This pilot project is therefore moving towards becoming an operational PES scheme. The EPWS scheme expects farmers to use payments for agricultural production and investment, and is providing extension support to assist with this. An example is the initiation of commercial agriculture (e.g. cabbages), which provides a greater improvement of livelihoods than is possible without the PES payments.
Effects on users The only paying buyer so far is the main water utility company in Dar es Salaam. It hopes that its initial investment in the scheme will help improve water quality and hence reduce water cleaning costs and that the savings can be passed on as increased profits and reduced water tariffs. Lower water tariffs would mainly be beneficial to the richer households in Dar es Salaam that access mains water, and industry. Poor people rely on informal collection by bucket of water from standpipes, from boreholes, or by accessing water pipes without making payments. As such the benefits to poor urban residents of this scheme, or even a similar one that is considerably scaled up, are likely to be marginal.
Derived effects In the pilot area c. 25% of the farmers are participating in the scheme and only a small part of the available land is under improved management. Farmers who are not part of the scheme have started to copy land interventions, suggesting they are willing to experiment but wish to avoid the formal structures of the scheme. The reasons for their decision have yet to be determined. More broadly across the Ruvu Basin and in the downstream city of Dar es Salaam the vast majority of non-participating people and industrial users of water are unaffected by not being involved in the scheme; as such its impact is limited.
Non-income benefits The creation of farmer's groups by the project has led to greater interactions and potential for learning. Other benefits are the introduction of novel farming technologies such as stall-fed goats and sheep, allowing the collection and application of manure that is expected to increase crop yields. However, none of these interventions are directly attributable to the scheme or derived from the limited payments that have been made to communities using funds made available by DAWASCO.
Discussion
We have outlined a pilot project in the Uluguru Mountains that is seeking to develop an operational PES scheme. Some of the initial results may eventually result in improved water quality for downstream users and forest conservation and improved livelihoods in the Mountains. This pilot scheme started at a small scale and has developed according to the demand of local farmers, using project and corporate social responsibility funds. Contracts are in place with several hundred farmers. The work has built upon previous agricultural work by CARE in these Mountains, and a collaboration with a local NGO (Ulguru Mountains Agricultural Development Project) that has been working with farmers in these Mountains for many years. The project's plan is to extend the scheme within the watershed and seek to deliver greater benefits, similar to the approach used in Los Negros in Bolivia (Asquith et al., Reference Asquith, Vargasa and Wunder2008).
This pilot project is of interest because there are few operational water PES schemes in Africa compared to other tropical regions (Ferraro, Reference Ferraro2009). One reason is a lack of willing buyers who have funding to invest in these schemes (typically hydroelectric power suppliers, large industrial users, municipal water suppliers, irrigation water users and general tax revenues). Additionally, the high levels of poverty in the rural and urban populations of Africa make it harder to institute formal payment systems for the general public. Other constraints include high transaction costs, weakly formalized land tenure and insufficient enabling policy and legal frameworks, fewer supporting institutions, and a general lack of capacity in relevant disciplines (Ferraro, Reference Ferraro2009). Together these make the establishment of PES schemes in Africa more challenging than elsewhere. These challenges are all present in the Uluguru Mountains.
Engel et al. (Reference Engel, Pagiola and Wunder2008) and Wunder et al. (Reference Wunder, Engel and Pagiola2008) suggested that the supply of environmental services from a PES project depends on four related issues: enrolment, conditionality, additionality and land use–service linkages. Within the EPWS project in the Uluguru Mountains the number of farmers wishing to join the scheme increased rapidly and continues to increase, mainly because farmers noted the increasing crop production of those who joined the scheme and because there was a financial incentive. This finding is similar to studies of pilot projects elsewhere (Pattanayak et al., Reference Pattanayak, Wunder and Ferraro2010).
In terms of conditionality the EPWS project pays farmers on the delivery of a land-use improvement technology that is expected to reduce run-off and hence improve water quality (van Noordwijk & Leimona, Reference Van Noordwijk and Leimona2010). This is despite the fact that a direct link between land-use changes and water quality improvement has not yet been established and that conditionality does not really exist in the payments, which will be a problem for scaling the pilot project into a full PES scheme. Currently, payments are related to the labour costs of undertaking the activities or are compensating opportunity lost (van Noordwijk & Leimona, Reference Van Noordwijk and Leimona2010). It has been proposed that the payment is annual and part of the full PES scheme but the reality is that its continuation depends on the provision of grant funds from DAWASCO or Coca Cola, government donors, or NGOs. Making payments fully conditional on delivery of improvements in services, and finding a sustainable source of funding, is vital to ensure that farmers maintain the implemented changes instead of reverting to old practices.
With respect to additionality, some changes in land use, namely bench terraces, would not have occurred without the project's presence. This is because bench terracing has a politically charged history on the Ulugurus (Young & Fosbrooke, Reference Young and Fosbrooke1960), having been forcibly imposed by the British colonial authorities and forcibly rejected by the local people. It is less certain whether other land-use changes can be attributed to specific payments from water users, or whether adoption is driven by other benefits, such as improved agricultural practices, increased yields and increased social capital and capacity through the formation of farmer groups. Furthermore, given the relatively small area of land covered by improved land management practices it is not yet possible to detect any significant change in water quality indicators downstream, and it is not known how large the intervention area will need to be to demonstrate real impact. As farmer numbers increase, it will be critical to track these changes to be able to link land-use change to water service change, particularly if additional buyers are to be engaged.
Until now the institutional framework for the Uluguru PES scheme has been provided by NGOs, with funding from two European development assistance agencies and with the political blessing of the government and the Water Basin Authority. Costs of the project interventions are high compared with the benefits that have been delivered, as with earlier integrated conservation and development projects in this area (Burgess et al., Reference Burgess, Thomas, Mhagama, Lehmberg, Springer, Barnard, Lovett and Ockwell2010b). It can, however, be argued that these high start-up costs are inevitable in a country with no past history of water PES schemes, and that future efforts, or expansion of the existing effort, will be cheaper and have a chance to be sustainable. This was not the case with the integrated conservation and development projects.
In terms of the Uluguru PES payment arrangements, all negotiations with buyers have been carried out by CARE/WWF because communities lacked capacity to undertake the negotiations. A switch over to community negotiation will be important for ensuing long-term sustainability and developing a mechanism that can be replicated at a larger scale across the Uluguru Mountains. A self-sustaining method for receiving funds and making payments is also required beyond the current project lifespan. Options include the Eastern Arc Mountains Conservation Endowment Fund (EAMCEF, 2011), or the semi-autonomous Water Basin Boards. In the future payments could also be sent direct from buyers to sellers using text message mobile phone banking technology, which already exists, cutting out middlemen, simplifying the procedure and dramatically reducing transaction costs.
Monitoring compliance is currently the task of the NGOs that are providing the funding, which is perhaps appropriate in these initial stages but is not ideal in the longer term. In other community-based schemes the basic monitoring is being undertaken by the local communities themselves and verification is provided by the service buyers; this may also provide a viable model for PES schemes such as this one in Tanzania (Danielsen et al., Reference Danielsen, Skutsch, Burgess, Jensen, Andrianandrasana and Karky2011; Gross-Camp et al., Reference Gross-Camp, Martin, McGuire, Kebede and Munyarukaza2011). The present monitoring data are insufficient to measure the impact of interventions on hydrology, sediment run-off, land-use change, forest integrity, agricultural yields, or livelihoods. This is a significant weakness but is also typical of similar projects elsewhere (Pattanayak et al., Reference Pattanayak, Wunder and Ferraro2010). The Uluguru PES project is addressing this issue by purchasing and installing hydrological monitoring equipment and engaging the Water Basin Authority to assist with that effort, and training local farmers to read and interpret the results and start to use them for local decision-making.
Because the project is in a small part of a much larger landscape it is also hard for the project to show impact on downstream water users. The scale of the project intervention is so small compared with the overall Ruvu River Basin that impacts cannot really be expected. Significant scaling up will be required if measurable changes in water quality are to be shown. However, the project has been successful in putting working arrangements in place and agreeing the first pilot water payments in eastern Africa. If a third project phase is agreed this may provide the platform for scaling up to a level that delivers impact that can be more easily measured. This would be good news for the emerging market-based approach to conservation.
Acknowledgements
We thank our respective institutions for providing time to write this article. CARE and WWF were supported by DANIDA and DGIS to establish this pilot PES project. Useful comments were received from Louise Glew at WWF–USA. We thank Professor Panteleo Munishi at Sokoine University of Agriculture and Professor Pius Yanda at the University of Dar es Salaam for allowing us to reproduce hydrological data from a consultant report to the CARE/WWF project. We thank Heri Kayeye at Sokoine University for the map of the study area and intervention farms, and we thank Phil Platts and Jonathan Green at Cambridge University for maps of the Eastern Arc and Uluguru Mountains, respectively.
Biographical sketches
This multidisciplinary team comprises a mixture of development specialists, managers of pro-poor PES schemes in Africa and Asia, conservation scientists, community forestry and wildlife management specialists, and an environmental economist and lawyer. The team has broad experience in working in Tanzania, on community development and forest conservation, and has been involved with much of the conservation work undertaken in the Uluguru Mountains over the past 2 decades. Together, this team has been involved in the design, management, external review and analytical assessment that forms the core of this article.