Extract

Over the years, the evolution of legal and contractual relationships between the suppliers of equipment and their customers has been fragmentary. Fiscal incentives for the supply of economical equipment have been rare, while incentive contracts for developing military equipment have been the cause of some controversy, particularly as regards allowances for inflation.

Immediate interests have tended to take precedence over longer term characteristics, which are often of more importance to customers. Relative merits of rewards, penalties and other motivating factors have received little attention in the literature, and philosophical considerations have been neglected.

Type
Research Article
Copyright
Copyright © Royal Aeronautical Society 1976 

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

References

1. Hardy, C. A. Impact of reliability improvement warranty (RIW) on avionic reliability: AGARD Lecture Series No. 81, pp 6-1 to 6-12.Google Scholar
2. Garnier, J. Failures affecting reliability of avionic systems: AGARD Lecture Series No. 81, pp 515.Google Scholar
3. Hardy, C. A. Avionic reliability and life cycle cost partnership: AGARD Lecture Series No. 81, pp 9-1 to 914.Google Scholar
4. Nixon, Frank. Managing to achieve quality and reliability: McGraw Hill, 1971.Google Scholar
5. Atiya, P. S. The sale of goods: Pitmans Paperbacks, 1972.Google Scholar
6. Various. Equipment and system design for minimum cost of ownership: RAeS/IEE Symposium on 16th March 1976.Google Scholar
7. Ball, L. W. Contracting for reliability (Final Report of Task Group V of the US Weapon System Effectiveness Industry Advisory Committee), 1965.Google Scholar
8. Hedger, E. F. Incentive contracting: the reliability of service equipment (IMech E Conference), 1968.Google Scholar
9. Polgar, E. A. and Yueh, J. H. A model for determination of incentive fees: Proc of 11th National Symposium on Reliability and Quality Control (IEEE, New York), 1965.Google Scholar
10. Profit formula for non-competitive government contracts: an exchange of letters between the Chief Secretary, HM Treasury and the President of the CBI (both letters dated 12th March 1975).Google Scholar
11. Stein, I. (Ed). Random House Dictionary of the English Language, Random House, New York.Google Scholar
12. World Airline Suppliers Guide, published by the air transport association of america, February 1968.Google Scholar
13. Kalin, S. R. and Johnson, R. D. Jr. Reliability and the incentive contract: Proc of 11th National Symposium (see above).Google Scholar
14. Bompas-Smith, J. H. Mechanical survival: McGraw Hill, 1973.Google Scholar
15. French, M. J. Reliability tests with artificially damaged components: The Engineer, May 1965.Google Scholar
16. Jones, H. C. Reliability testing: Proc. of 11th National Symposium (see above).Google Scholar
17. Lovesey, A. C. Modern methods of testing aero-engines and power plants: The Aeronautical Journal of the RAeS, June 1950.Google Scholar
18. Lovesey, A. C. The art of developing aero-engines: The Aeronautical Journal of the RAeS, Vol 63. August 1959.Google Scholar
19. Lovesey, A. C. Gas turbine development—13 years in commercial aircraft. The Aeronautical Journal of the RAeS, Vol 68. August 1964.Google Scholar
20. Grose, V. L. Reliability can be predicted? (A negative position): Annals of Reliability and Maintainability, Vol 4 (1965), pp 119129.Google Scholar
21. Brook, R. H. W. Reliability concepts in engineering manufacture: Butterworths, 1972.Google Scholar
22. Magnaflux brochure for brittle coatings.Google Scholar
23. Guide for the Evaluation of a Contractor's Quality Control System for Compliance with Def. Stan. 05-21, January 1973.Google Scholar
24. Grant, Ireson W. (Ed). Reliability Handbook: McGraw Hill, 1966.Google Scholar
25. Carnegie, Dale. How to win friends and influence people: Worlds Work, 1938.Google Scholar
26. Sandilands, F. E. P. Inflation Accounting: a brief guide to the Report of the Inflation Accounting Committee, HMSO, 1975.Google Scholar