Hostname: page-component-5d84bcc8dc-dn49l Total loading time: 0 Render date: 2026-09-15T17:57:56.943Z Has data issue: false hasContentIssue false

The Impact of a Large-Scale Power Outage on Hemodialysis Center Operations

Published online by Cambridge University Press:  22 August 2013

Mahshid Abir*
Affiliation:
George Washington University, Department of Emergency Medicine, Washington, DC USA and RAND Corporation, Arlington, Virginia USA
Sophia Jan
Affiliation:
University of Pennsylvania, Departments of Internal Medicine and Pediatrics, Philadelphia, Pennsylvania USA
Lindsay Jubelt
Affiliation:
University of Pennsylvania, Department of Internal Medicine, Philadelphia, Pennsylvania USA
Raina M. Merchant
Affiliation:
University of Pennsylvania, Department of Emergency Medicine, Philadelphia, Pennsylvania USA
Nicole Lurie
Affiliation:
Department of Health and Human Services, Washington, DC USA
*
Correspondence: Mahshid Abir, MD, MSc 310 Springloch Rd Silver Spring, MD 20904 USA E-mail mabir@mfa.gwu.edu or mabir@rand.org

Abstract

Introduction

On June 29, 2012, mid-Atlantic storms resulted in a large-scale power outage affecting up to three million people across multiple (US) states. Hemodialysis centers are dependent on electricity to provide dialysis care to end-stage renal disease patients. The objective of this study was to determine how the power outage impacted operations in a sample of hemodialysis centers in the impacted regions.

Methods

The sample consisted of all hemodialysis centers located in the District of Columbia and a total of five counties with the largest power losses in West Virginia, Virginia, and Maryland. A semi-structured interview guide was developed, and the charge nurse or supervisor in each facility was interviewed. The survey questions addressed whether their centers lost power, if so, for how long, where their patients received dialysis, whether their centers had backup generators, and if so, whether they had any problems operating them, and whether their center received patients from other centers if they had power.

Results

Calls were placed to 90 dialysis centers in the sampled areas and a 90% response rate was achieved. Overall, hemodialysis operations at approximately 30% (n = 24) of the centers queried were impacted by the power outage. Of the 36 centers that lost power, 31% (n = 11) referred their patients to other dialysis centers, 22% (n = 8) accommodated their patients during a later shift or on a different day; the rest of the centers either experienced brief power outages that did not affect operations or experienced a power outage on days that the center is usually closed. Some centers in the study cohort reported receiving patients from other centers for dialysis 33% (n = 27). Thirty-two percent (n = 26) of the centers queried had backup generators on site. Eleven percent (n = 4) of the centers experiencing power outages reported that backup generators were brought in by their parent companies.

Conclusions

Comprehensive emergency planning for dialysis centers should include provisions for having backup generators on site, having plans in place for the timely delivery of a generator during a power outage, or having predesignated backup dialysis centers for patients to receive dialysis during emergencies. Most dialysis centers surveyed in this study were able to sustain continuity of care by implementing such pre-existing emergency plans.

AbirM, JanS, JubeltL, MerchantR, LurieN. The Impact of a Large-Scale Power Outage on Hemodialysis Center Operations. Prehosp Disaster Med. 2013;28(6):1-4.

Information

Type
Original Research
Copyright
Copyright © World Association for Disaster and Emergency Medicine 2013 