Hostname: page-component-848d4c4894-2pzkn Total loading time: 0 Render date: 2024-05-17T05:09:34.869Z Has data issue: false hasContentIssue false

Human resource management (HRM) in temporary work agencies: Evidence from the hospitality industry

Published online by Cambridge University Press:  01 January 2023

Angela Knox*
Affiliation:
The University of Sydney, Australia
*
Angela Knox, Business School, The University of Sydney, Sydney, NSW 2006, Australia. Email: angela.knox@sydney.edu.au

Abstract

Overwhelmingly, research examining temporary work agency (TWA) employment suggests that agencies rely on cost-based HRM, which coincides with substandard outcomes for TWA workers and clients. While contrasting literature indicates that ‘value adding’ HRM may yield more positive outcomes, empirical evidence remains scarce. This case study–based research begins to redress this gap by comparing TWAs reliant on cost-based and ‘value adding’ HRM within the hospitality industry. Findings illustrate that TWA employment and ‘value adding’ HRM are compatible and advantageous, yielding superior outcomes for TWA workers and clients.

Type
Symposium Articles
Copyright
© The Author(s) 2013

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

References

Aletraris, L (2010) How satisfied are they and why? A study of job satisfaction, job rewards, gender and temporary agency workers in Australia. Human Relations 63(8): 11291155.CrossRefGoogle Scholar
Alleyne, P, Doherty, L, Greenidge, D (2006) Human resource management and performance in the Barbados hotel industry. International Journal of Hospitality Management 25(4): 623646.CrossRefGoogle Scholar
Alonzo, A, Simon, A (2008) Have stethoscope, will travel: contingent employment among physician health care providers in the United States. Work, Employment & Society 22(4): 635654.Google Scholar
Appelbaum, E, Bailey, T, Berg, P, et al . (2000) Manufacturing Advantage: Why High Performance Work Systems Pay Off. Ithaca, NY: Cornell University Press.Google Scholar
Arthur, J (1992) The link between business strategy and industrial relations systems in American steel minimills. Industrial & Labor Relations Review 45(3): 488506.CrossRefGoogle Scholar
Arthur, J (1994) Effects of human resource systems on manufacturing performance and turnover. Academy of Management Journal 37(3): 670687.CrossRefGoogle Scholar
Baxter, P, Jack, S (2008) Qualitative case study methodology: study design and implementation for novice researchers. The Qualitative Report 13(4): 544559.Google Scholar
Burgess, J, Connell, J (2004) International aspects of temporary agency employment: an overview. In: Burgess, J, Connell, J (eds) International Perspectives on Temporary Agency Work. London: Routledge, pp. 123.CrossRefGoogle Scholar
Burgess, J, Connell, J (2006) Temporary work and human resource management: issues, challenges and responses. Personnel Review 35(2): 129140.CrossRefGoogle Scholar
Cabrera, E, Cabrera, A (2005) Fostering knowledge sharing through people management practices. International Journal of Human Resource Management 16(5): 720735.CrossRefGoogle Scholar
Ceylan, C (2013) Commitment-based HR practices, different types of innovation activities and firm innovation performance. International Journal of Human Resource Management 24(1): 208226.CrossRefGoogle Scholar
Collins, C, Smith, K (2006) Knowledge exchange and combination: the role of human resource practices in the performance of high-technology firms. Academy of Management Journal 49(3): 544560.CrossRefGoogle Scholar
Drucker, J, Stanworth, C (2001) Partnerships and the private recruitment industry. Human Resource Management Journal 11(2): 7388.Google Scholar
Fair Work Ombudsman (FWO) (2012) National hospitality campaign 2012–2015 accommodation, pubs, taverns and bars. Available at: http://www.australianhotels.asn.au/attachments/Joint%20FWO%20AHA%20letter%20re%20campain%20Sept%202012.pdf (accessed 10 November 2012).Google Scholar
Flick, U (1998) An Introduction to Qualitative Research. London: SAGE.Google Scholar
Flyvbjerg, B (2011) Case study. In: Denzin, N, Lincoln, Y (eds) The SAGE Handbook of Qualitative Research. 4th ed. Thousand Oaks, CA: SAGE, pp. 301316.Google Scholar
Forde, C, Slater, G (2006) The nature and experience of agency working in Britain: what are the challenges for human resource management? Personnel Review 35(2): 141157.CrossRefGoogle Scholar
Guest, D, Michie, J, Conway, N, et al . (2003) Human resource management and corporate performance in the UK. British Journal of Industrial Relations 41(2): 291314.CrossRefGoogle Scholar
Hall, R (2006) Temporary agency work and HRM in Australia: cooperation, specialization and satisfaction for the good of all? Personnel Review 35(2): 158174.Google Scholar
Hoque, K (1999) Human resource management and performance in the UK hotel industry. British Journal of Industrial Relations 37(3): 419443.CrossRefGoogle Scholar
Hoque, K, Kirkpatrick, I, De Ruyter, A, et al . (2008) New contractual relationships in the agency worker market: the case of the UK’s National Health Service. British Journal of Industrial Relations 46(3): 389412.CrossRefGoogle Scholar
Hoque, K, Kirkpatrick, I, Lonsdale, C, et al . (2011) Outsourcing the procurement of agency workers: the impact of vendor managed services in English social care. Work, Employment & Society 25(3): 522539.CrossRefGoogle Scholar
Kalleberg, A, Reskin, B, Hudson, K (2000) Bad jobs in America: standard and non standard employment relations and job quality in the United States. American Sociological Review 65(2): 256278.CrossRefGoogle Scholar
Kirkpatrick, I, Hoque, K (2006) A retreat from permanent employment? Accounting for the rise of professional agency work in UK public services. Work, Employment & Society 20(4): 649666.CrossRefGoogle Scholar
Knox, A (2010) ‘Lost in translation’: an analysis of temporary work agency employment in hotels. Work, Employment & Society 24(3): 449467.Google Scholar
Lai, P, Soltani, E, Baum, T (2008) Distancing flexibility in the hotel industry: the role of employment agencies as labour suppliers. International Journal of Human Resource Management 19(1): 132152.CrossRefGoogle Scholar
Lepak, D, Snell, S (2002) Examining the human resource architecture: the relationships among human capital, employment and human resource configurations. Journal of Management 28(4): 517543.CrossRefGoogle Scholar
Lepak, D, Snell, S (2007) Employment subsystems and the ‘HR architecture’. In: Boxall, P, Purcell, J, Wright, P (eds) The Oxford Handbook of Human Resource Management. New York: Oxford University Press, pp. 210230.Google Scholar
Liao, Y (2005) Business strategy and performance: The role of human resource management and control. Personnel Review 43(3): 294309.CrossRefGoogle Scholar
Liquor Hospitality and Miscellaneous Workers Union (LHMU) (2000) Hotels to Be Proud of: Better Jobs, Better Hotels. Sydney, NSW, Australia: Liquor Hospitality and Miscellaneous Workers Union.Google Scholar
Liquor Hospitality and Miscellaneous Workers Union (LHMU) (2009) Rescue Package for Luxury Hotels: Better Jobs, Better Hotels. Sydney, NSW, Australia: Liquor Hospitality and Miscellaneous Workers Union.Google Scholar
McDowell, L, Batnitzky, A, Dyer, S (2008) Internationalization and the spaces of temporary labour: the global assembly of a local workforce. British Journal of Industrial Relations 46(4): 750770.CrossRefGoogle Scholar
McKeown, T (2005) Non-standard employment: when even the elite are precarious. Journal of Industrial Relations 47(3): 276293.CrossRefGoogle Scholar
Michie, J, Sheehan, M (2005) Business strategy, human resources, labour market flexibility and competitive advantage. International Journal of Human Resource Management 16(3): 445464.CrossRefGoogle Scholar
Mitlacher, L (2008) Job quality and temporary agency work: challenges for human resource management in triangular employment relations in Germany. International Journal of Human Resource Management 19(3): 446460.CrossRefGoogle Scholar
Oxenbridge, S, Moensted, M (2011) The relationship between payment systems, work intensification and health and safety outcomes: a study of hotel room attendants. Policy and Practice in Health and Safety 9(2): 726.CrossRefGoogle Scholar
Peck, J, Theodore, N (1998) The business of contingent work: growth and restructuring in Chicago’s temporary employment industry. Work, Employment & Society 12(4): 655674.CrossRefGoogle Scholar
Rogers, J (2000) Temps: The Many Faces of the Changing Workplace. Ithaca, NY: Cornell University Press.Google Scholar
Torka, N, Schyns, B (2010) On the job and co-worker commitment of Dutch agency workers and permanent employees. International Journal of Human Resource Management 21(7): 13071322.CrossRefGoogle Scholar
Underhill, E, Quinlan, M (2011) How precarious employment affects health and safety at work: the case of temporary agency workers. Relations Industrielles/Industrial Relations 66(3): 397421.CrossRefGoogle Scholar
Victorian Immigrant and Refugee Women’s Coalition (VIRWC) and Liquor Hospitality and Miscellaneous Workers Union (LHMU) (2010) Heartbreak Hotels: The Crisis inside Melbourne’s Luxury Hotels. Melbourne, VIC, Australia: Queen Victoria Women’s Centre.Google Scholar
Workplace Express (2012) Big fine for employer conduct among worst seen by court. Workplace Express, 9 March.Google Scholar
Yin, R (2003) Case Study Research: Design and Methods. 3rd ed. Thousand Oaks, CA: SAGE.Google Scholar