Chapter 15 - The Roles of Governance Mechanisms to Manage Misbehaviors in the Project Front-End

from Part III - Practical Tips

Published online by Cambridge University Press:  aN Invalid Date NaN

Lavagnon A. Ika
Affiliation:
University of Ottawa
Jeffrey K. Pinto
Affiliation:
Pennsylvania State University
Get access

Summary

The project front-end has long been understood as a project phase critical to overall project success. In this chapter, we investigate the underexplored topic of (mis-)behaviour in the project front-end. Drawing upon literature on contractual and relational governance mechanisms, we argue that traditional forms of project governance do not have strong applicability to help address some of the most important challenges facing the front-end of projects. This chapter commences by considering how misbehaviours can manifest and be present at different levels of analysis (macro, meso, micro). We then briefly review extant governance studies before considering how misbehaviours can be tackled through such (contractual and relational) governance mechanisms. We conclude our chapter by presenting a future research agenda to help further address the important and under-researched topic of project front-end misbehaviour.

Information

Type
Chapter
Information
Publisher: Cambridge University Press
Print publication year: 2025

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

Book purchase

Temporarily unavailable

References

Aaltonen, K., Kujala, J., Havela, L., and Savage, G. (2015). Stakeholder dynamics during the project front-end: The case of nuclear waste repository projects. Project Management Journal, 46(6), 1541.10.1002/pmj.21549CrossRefGoogle Scholar
Aben, T, Van der Valk, W., Roehrich, J. K., and Selviaridis, K. (2021). Digital transformation in public-private relationships: The role of inter-organisational governance in managing information asymmetry. International Journal of Operations and Production Management, 41(7), 11451191.10.1108/IJOPM-09-2020-0675CrossRefGoogle Scholar
Ashforth, B., and Anand, V. (2003). The normalization of corruption in organizations. Research in Organizational Behavior, 25(1), 152.10.1016/S0191-3085(03)25001-2CrossRefGoogle Scholar
Biesenthal, C. and Wilden, R. (2014). Multi-level project governance: Trends and opportunities. International Journal of Project Management, 32(8), 12911308.10.1016/j.ijproman.2014.06.005CrossRefGoogle Scholar
Borg, J., and Scott-Young, C. (2022). Contributing factors to turnover intentions of early career project management professionals in construction. Construction Management and Economics, 40(10), 835853.CrossRefGoogle Scholar
Brady, T., and Davies, A. (2004). Building project capabilities: From exploratory to exploitative learning. Organization Studies, 25(9), 16011621.10.1177/0170840604048002CrossRefGoogle Scholar
Brady, T., and Davies, A. (2014). Managing structural and dynamic complexity: A tale of two projects. Project Management Journal, 45(4), 2138.10.1002/pmj.21434CrossRefGoogle Scholar
Breese, R., Couch, O., and Turner, D. (2020). The project sponsor role and benefits realisation: More than “just doing the day job.” International Journal of Project Management, 38(1), 1726.CrossRefGoogle Scholar
Buvinić, M. (1986). Projects for women in the third world: Explaining their misbehavior. World Development, 14(5), 653664.10.1016/0305-750X(86)90130-0CrossRefGoogle Scholar
Caldwell, N., Roehrich, J. K., and George, G. (2017). Social value creation and relational coordination in public-private collaborations. Journal of Management Studies, 54(6), 906928.10.1111/joms.12268CrossRefGoogle Scholar
Campbell, W., Hoffman, B., Campbell, S., and Marchisio, G. (2011). Narcissism in organizational contexts. Human Resource Management Review, 21(4), 268284.Google Scholar
Cantarelli, C., and Genovese, A. (2021). Innovation potential of megaprojects: A systematic literature review. Production, Planning and Control, 34(10), 1350–1370.Google Scholar
Cao, Z., and Lumineau, F. (2015). Revisiting the interplay between contractual and relational governance: A qualitative and meta-analytic investigation. Journal of Operations Management, 33(1), 1542.10.1016/j.jom.2014.09.009CrossRefGoogle Scholar
Cicmil, S., Williams, T., Thomas, J., and Hodgson, D. (2006). Rethinking project management: Researching the actuality of projects. International Journal of Project Management, 24(8), 675686.10.1016/j.ijproman.2006.08.006CrossRefGoogle Scholar
Crane, A. (2013). Modern slavery as a management practice: Exploring the conditions and capabilities for human exploitation. Academy of Management Review, 38(1), 4969.10.5465/amr.2011.0145CrossRefGoogle Scholar
Dahlgren, J., and Söderlund, J. (2010). Modes and mechanisms in multi-project organisations: The R&D case. International Journal of Technology Management, 50(1), 122.10.1504/IJTM.2010.031915CrossRefGoogle Scholar
Das, T., and Teng, B. (2001). Trust, control, and risk in strategic alliances: An integrated framework. Organization Studies. 22(2), 251283.10.1177/0170840601222004CrossRefGoogle Scholar
Davies, A., Gann, D., and Douglas, T. (2009). Innovation in megaprojects: Systems integration at London Heathrow Terminal 5. California Management Review, 51(2), 101125.10.2307/41166482CrossRefGoogle Scholar
Davies, A., and Mackenzie, I. (2014). Project complexity and systems integration: Constructing the London 2012 Olympics and Paralympics games. International Journal of Project Management, 35(4), 773790.10.1016/j.ijproman.2013.10.004CrossRefGoogle Scholar
Davies, A. (2017). Projects: A very short introduction. Oxford University Press.10.1093/actrade/9780198727668.001.0001CrossRefGoogle Scholar
Davies, A., MacAulay, S., and Brady, T. (2019). Delivery model innovation: Insights from infrastructure projects. Project Management Journal, 50(2), 119127.10.1177/8756972819831145CrossRefGoogle Scholar
Edkins, A., Geraldi, J., Morris, P., and Smith, A. (2013). Exploring the front-end of project management. Engineering Project Organization Journal, 3(2), 7185.10.1080/21573727.2013.775942CrossRefGoogle Scholar
Engelhart, J., Roehrich, J. K., and Squire, B. (2023). Governing inter-organisational relationships in large projects: A review and future research agenda (pp. 213222). In Winch, G., Brunet, M., and Cao, D. (eds.). Research handbook on complex project organizing. Edward Elgar.10.4337/9781800880283.00032CrossRefGoogle Scholar
Flyvbjerg, B. (2006). From Nobel Prize to project management: Getting risks right. Project Management Journal, 37(3), 515.10.1177/875697280603700302CrossRefGoogle Scholar
Flyvbjerg, B. (2017). Did megaproject research pioneer behavioural economics: The case of Albert O. Hirschman (pp. 155193). In Flyvbjerg, B. (ed.). Oxford Handbook of Megaproject Management. Oxford University Press.10.1093/oxfordhb/9780198732242.001.0001CrossRefGoogle Scholar
Flyvbjerg, B. (2021). Top ten biases in project management: An overview. Project Management Journal, 52(6), 531546.10.1177/87569728211049046CrossRefGoogle Scholar
Frishammar, J., Florén, H., & Wincent, J. (2010). Beyond managing uncertainty: Insights from studying equivocality in the fuzzy front end of product and process innovation projects. IEEE Transactions on Engineering Management, 58(3), 551563.10.1109/TEM.2010.2095017CrossRefGoogle Scholar
Gulati, R., Wohlgezogen, F., and Zhelyazkov, P. (2012). The two facets of collaboration: Cooperation and coordination in strategic alliances. Academy of Management Annals, 6(1), 531583.10.5465/19416520.2012.691646CrossRefGoogle Scholar
Hajikazemi, S., Aaltonen, K., Ahola, T., Aarseth, W., and Andersen, B. (2020). Normalising deviance in construction project organizations: A case study on the collapse of Carillion. Construction Management and Economics, 38(12), 11221138.10.1080/01446193.2020.1804069CrossRefGoogle Scholar
Hellström, M., Ruuska, I., Wikström, K., and Jåfs, D. (2013). Project governance and path creation in the early stages of Finnish nuclear power projects. International Journal of Project Management, 31(5), 712723.CrossRefGoogle Scholar
Hirschman, A. (1967). Development projects observed. Brookings Institution Press.Google Scholar
Hirschman, A. (2014). Development projects observed. Brookings Institution Press.Google Scholar
Hoetker, G., and Mellewigt, T. (2009). Choice and performance of governance mechanisms: Matching alliance governance to asset type. Strategic Management Journal, 30(1), 10251044.10.1002/smj.775CrossRefGoogle Scholar
Huang, M., Cheng, H., and Tseng, C. (2014). Re-examining the direct and interactive effects of governance mechanisms upon buyer–supplier cooperative performance. Industrial Marketing Management, 43(4), 704716.10.1016/j.indmarman.2014.02.001CrossRefGoogle Scholar
Ika, L., and Söderlund, J. (2016). Rethinking revisited: Insights from an early rethinker. International Journal of Managing Projects in Business, 9(4), 931954.10.1108/IJMPB-05-2016-0041CrossRefGoogle Scholar
Ika, L., Love, P., and Pinto, J. (2022). Moving beyond the planning fallacy: The emergence of a new principle of project behavior. IEEE Transactions on Engineering Management, 69(6), 33103325.CrossRefGoogle Scholar
Jayaraman, V., Narayanan, S., Luo, Y., and Swaminathan, J. (2013). Offshoring business process services and governance control mechanisms: An examination of service providers from India. Production and Operations Management, 22(2), 314334.10.1111/j.1937-5956.2011.01314.xCrossRefGoogle Scholar
Kalra, J., Lewis, M., and Roehrich, J.K. (2021). Manifestation of coordination failures in service triads. Supply Chain Management: An International Journal, 26(3), 341358.10.1108/SCM-03-2019-0115CrossRefGoogle Scholar
Kapsali, M., Roehrich, J. K., and Akhtar, P. (2018). Effective contracting for high operational performance in projects. International Journal of Operations and Production Management, 39(2), 294325.10.1108/IJOPM-10-2017-0604CrossRefGoogle Scholar
Karaba, F., Roehrich, J. K., Conway, S., and Turner, J. (2022). Information sharing in public-private relationships: The role of boundary objects in contracts. Public Management Review, 25(11), 2166–2190.10.1080/14719037.2022.2065344CrossRefGoogle Scholar
Klakegg, O., Williams, T., and Shiferaw, A. (2016). Taming the “trolls”: Major public projects in the making. International Journal of Project Management, 34(2), 282296.10.1016/j.ijproman.2015.03.008CrossRefGoogle Scholar
Kloppenborg, T., Tesch, D., and Manolis, C. (2014). Project success and executive sponsor behaviours: Empirical life cycle stage investigations. Project Management Journal, 45(1), 920.10.1002/pmj.21396CrossRefGoogle Scholar
Kreiner, K. (2020). Conflicting notions of a project: The battle between Albert O. Hirschman and Bent Flyvbjerg. Project Management Journal, 51(4), 400410.10.1177/8756972820930535CrossRefGoogle Scholar
Larson, A. (1992). Network dyads in entrepreneurial settings: A study of the governance of exchange relationships. Administrative Science Quarterly, 37(1), 76104.10.2307/2393534CrossRefGoogle Scholar
Lessard, D., and Miller, R. (2013). The shaping of large engineering projects (pp. 3456). In Priemus, H., and van Wee, B. (eds.). International handbook on megaprojects. Edward Elgar.Google Scholar
Levitt, R., and Scott, R. (2017). Institutional challenges and solutions for global megaprojects (pp. 96117). In Flyvbjerg, B. (ed.). Oxford handbook of Megaproject Management. Oxford University Press.Google Scholar
Lewis, M., Harrison, J., and Roehrich, J. K. (2023). Its all a bit fuzzy? The front-end in project and innovation management (pp. 101124) In A. Davies, S. Lenfle, C. Loch and C. Midler (eds.). Handbook of Innovation and Project Management. Edward Elgar.10.4337/9781789901801.00011CrossRefGoogle Scholar
Li, Y., Xie, E., Teo, H., and Peng, M. (2010). Formal control and social control in domestic and international buyer–supplier relationships. Journal of Operations Management, 28(4), 333344.10.1016/j.jom.2009.11.008CrossRefGoogle Scholar
Li, Y., Lu, Y, Cui, Q., and Han, Y. (2019). Organizational behaviour in megaprojects: Integrative review and directions for future research. Journal of Management in Engineering, 35(4), 111.10.1061/(ASCE)ME.1943-5479.0000691CrossRefGoogle Scholar
Liu, Y., Luo, Y., and Liu, T. (2009). Governing buyer-supplier relationships through transactional and relational mechanisms: Evidence from China. Journal of Operations Management, 27(4), 294309.10.1016/j.jom.2008.09.004CrossRefGoogle Scholar
Liu, Y., Li, Y., and Zhang, L. (2010). Control mechanisms across a buyer-supplier relationship matrix. Journal of Business Research, 63(1), 312.10.1016/j.jbusres.2009.01.005CrossRefGoogle Scholar
Locatelli, G., Mariani, G., Sainati, T., and Greco, M. (2017). Corruption in public projects and megaprojects: There is an elephant in the room. International Journal of Project Management, 35(3), 252268.10.1016/j.ijproman.2016.09.010CrossRefGoogle Scholar
Love, P., Ika, L., and Ahiaga-Dagbui, D. (2019). On de-bunking “fake news” in a post truth era: Why does the planning fallacy explanation for cost overruns fall short? Transportation Research Part A: Policy and Practice, 126(1), 397408.Google Scholar
Lumineau, F., and Henderson, J. (2012). The influence of relational experience and contractual governance on the negotiation strategy in buyer-supplier disputes. Journal of Operations Management, 30(5), 382395.10.1016/j.jom.2012.03.005CrossRefGoogle Scholar
Maier, E., and Branzei, O. (2014). “On time and on budget”: Harnessing creativity in large scale projects. International Journal of Project Management, 32(7), 11231133.10.1016/j.ijproman.2014.02.009CrossRefGoogle Scholar
Matinheikki, J., Artto, K., Peltokorpi, A., and Rajala, R. (2016). Managing inter-organizational networks for value creation in the front-end of projects. International Journal of Project Management, 34(7), 12261241.10.1016/j.ijproman.2016.06.003CrossRefGoogle Scholar
Mauro, P. (1998). Corruption and the composition of government expenditure. Journal of Public Economics, 69(2), 263279.10.1016/S0047-2727(98)00025-5CrossRefGoogle Scholar
McClory, S., Read, M., and Labib, A. (2017). Conceptualising the lessons-learned process in project management: Towards a triple-loop learning framework. International Journal of Project Management, 35(7), 13221335.CrossRefGoogle Scholar
Mellewigt, T., Madhok, A., and Weibel, A. (2007). Trust and formal contracts in interorganizational relationships – substitutes and complements. Managerial and Decision Economics, 28(8), 833847.10.1002/mde.1321CrossRefGoogle Scholar
Mesquita, L., and Brush, T. (2008). Untangling safeguard and production coordination effects in long-term buyer-supplier relationships. Academy of Management Journal, 51(4), 785807.Google Scholar
Miller, R., and Lessard, D. (2000). The strategic management of large engineering projects: Shaping institutions, risks, and governance. MIT Press.Google Scholar
Mo, P. (2001). Corruption and economic growth. Journal of Comparative Economics, 29(1), 6679.10.1006/jcec.2000.1703CrossRefGoogle Scholar
Morris, P. (2009). Implementing strategy through project management: The importance of managing the project front-end. In Williams, T., Samset, K., and Sunnevåg, K. (eds.). Making essential choices with scant information: Front-end decision making in major projects. Palgrave Macmillan.Google Scholar
Müller, R. (2009). Project governance. Gower.Google Scholar
Müller, R., Turner, R., Andersen, E., Shao, J., and Kvalnes, Ø. (2014). Ethics, trust, and governance in temporary organizations. Project Management Journal, 45(4), 3954.10.1002/pmj.21432CrossRefGoogle Scholar
Næss, P., Andersen, J., Nicolaisen, M., and Strand, A. (2015). Forecasting inaccuracies: A result of unexpected events, optimism bias, technical problems, or strategic misrepresentation? Journal of Transport and Land Use, 8(3), 3955.Google Scholar
Oliveira, N., and Lumineau, F. (2017). How coordination trajectories influence the performance of interorganizational project networks. Organization Science, 28(6), 10291060.10.1287/orsc.2017.1151CrossRefGoogle Scholar
Olsson, N. O., & Magnussen, O. M. (2007). Flexibility at different stages in the life cycle of projects: an empirical illustration of the “freedom to maneuver”. Project Management Journal, 38(4), 2532.10.1002/pmj.20015CrossRefGoogle Scholar
Parker, S., and Skitmore, M. (2005). Project management turnover: Causes and effects on project performance. International Journal of Project Management, 23(3), 205214.10.1016/j.ijproman.2004.10.004CrossRefGoogle Scholar
Pich, M., Loch, C., and De Meyer, A. (2002). On uncertainty, ambiguity, and complexity in project management. Management Science, 48(8), 10081023.10.1287/mnsc.48.8.1008.163CrossRefGoogle Scholar
Pinto, J. (2000). Understanding the role of politics in successful project management. International Journal of Project Management, 18(2), 8591.10.1016/S0263-7863(98)00073-8CrossRefGoogle Scholar
Pinto, J. (2014). Project management, governance, and the normalization of deviance. International Journal of Project Management, 32(3), 376387.10.1016/j.ijproman.2013.06.004CrossRefGoogle Scholar
Pinto, J., and Patanakul, P. (2015). When narcissism drives project champions: A review and research agenda. International Journal of Project Management, 33(1), 11801190.10.1016/j.ijproman.2015.01.013CrossRefGoogle Scholar
Poppo, L., and Zenger, T. (2002). Do formal contracts and relational governance function as substitutes or complements? Strategic Management Journal, 23(8), 707725.10.1002/smj.249CrossRefGoogle Scholar
Provan, K., and Skinner, S. (1989). Interorganizational dependence and control as predictors of opportunism in dealer-supplier relations. Academy of Management Journal, 32(1), 202212.10.2307/256427CrossRefGoogle Scholar
Roehrich, J. K., and Lewis, M. (2014). Procuring complex performance: Implications for exchange governance complexity. International Journal of Operations and Production Management, 34(2), 221241.10.1108/IJOPM-01-2011-0024CrossRefGoogle Scholar
Roehrich, J. K., Davies, A., Frederiksen, L., and Sergeeva, N. (2019). Management innovation in complex products and systems: The case of integrated project teams. Industrial Marketing Management, 79(1), 8493.10.1016/j.indmarman.2018.10.006CrossRefGoogle Scholar
Roehrich, J. K., Selviaridis, K., Karla, J., Van der Valk, W., and Fang, F. (2020). Inter-organizational governance: A review, conceptualisation, and extension. Production Planning and Control, 31(6), 453469.10.1080/09537287.2019.1647364CrossRefGoogle Scholar
Roehrich, J. K., and Kivleniece, I. (2022). Creating and distributing sustainable value through public-private collaborative projects (pp. 474500). In George, G., Hass, M., Joshi, H., McGahan, A., and Tracey, P. (eds.). Handbook on the business of sustainability: The organization, implementation, and practice of sustainable growth. Edward Elgar.Google Scholar
Roehrich, J. K., Kalra, J., Squire, B., and Davies, A. (2023). Network orchestration in a large inter-organizational project. Journal of Operations Management, 69(7), 1078–1099.10.1002/joom.1237CrossRefGoogle Scholar
Sagie, A., Statshevsky, S., and Koslowsky, M. (2003). Misbehaviour and dysfunctional attitudes in organizations. Springer.10.1057/9780230288829CrossRefGoogle Scholar
Salbu, S. (1997). Evolving contract as a device for flexible coordination and control. American Business Law Journal, 34(1), 329384.10.1111/j.1744-1714.1997.tb00898.xCrossRefGoogle Scholar
Samset, K., Andersen, B., and Austeng, K. (2014). To which extent do projects explore the opportunity space? A study of conceptual appraisals and the choice of conceptual solutions. International Journal of Managing Projects in Business, 7(3), 473492.10.1108/IJMPB-08-2013-0038CrossRefGoogle Scholar
Samset, K., and Volden, G. (2016). Front-end definition of projects: Ten paradoxes and some reflections regarding project management and project governance. International Journal of Project Management, 34(2), 297313.10.1016/j.ijproman.2015.01.014CrossRefGoogle Scholar
Sarafan, M., Lawson, B., Roehrich, J. K., and Squire, B. (2022). Knowledge sharing within project-based supply networks. International Journal of Operations and Production Management, 42(6), 852874.10.1108/IJOPM-06-2021-0394CrossRefGoogle Scholar
Serrador, P., and Pinto, J. (2015). Does agile work? A quantitative analysis of agile project success. International Journal of Project Management, 33(5), 10401051.10.1016/j.ijproman.2015.01.006CrossRefGoogle Scholar
Schepker, D., Oh, W., and Poppo, L. (2014). The many futures of contracts: Moving beyond structure and safeguarding to coordination and adaptation. Journal of Management, 40(1), 193225.10.1177/0149206313491289CrossRefGoogle Scholar
Schilke, O., and Lumineau, F. (2018). The double-edged effect of contracts on alliance performance. Journal of Management, 44(7), 28272858.10.1177/0149206316655872CrossRefGoogle Scholar
Shafi, M, Iqbal, R., Shahzad, K., and Unterhitzenberger, C. (2021). The mediating role of project citizenship behavior in the relationship between organizational justice dimensions and project success. Project Management Journal, 52(6), 547562.10.1177/87569728211026423CrossRefGoogle Scholar
Shenhar, A., and Dvir, D. (2007). Reinventing project management: The diamond approach to successful growth and innovation. MIT Press.Google Scholar
Shiferaw, A., Klakegg, O., and Haavaldsen, T. (2012). Governance of public investment projects in Ethiopia. Project Management Journal, 43(4), 5269.10.1002/pmj.21280CrossRefGoogle Scholar
Unterhitzenberger, C. (2021). Special issue on project behavior. Project Management Journal, 52(6), 527530.CrossRefGoogle Scholar
Van Wee, B. (2013). Ethics and the ex-ante evaluation of megaprojects (pp. 356378). In Priemus, H. and van Wee, B. (eds.). International Handbook on Megaprojects. Edward Elgar.Google Scholar
Vandaele, D., Rangarajan, D., Gemmel, P., and Lievens, A. (2007). How to govern business services exchanges: Contractual and relational issues. International Journal of Management Reviews, 9(3), 237258.10.1111/j.1468-2370.2007.00212.xCrossRefGoogle Scholar
Vaughan, D. (1996). The challenger launch decision: Risky technology, culture, and deviance at NASA. University of Chicago Press.Google Scholar
Vaughan, D. (2004). Organizational rituals of risk and error (pp. 3366). In Hunter, B. and Power, M. (eds.). Organization encounters with risk. Cambridge University Press.Google Scholar
Wang, L., Müller, R., Zhu, F., and Yang, X. (2021). Collective mindfulness: The key to organizational resilience in megaprojects. Project Management Journal, 52(6), 592606.10.1177/87569728211044908CrossRefGoogle Scholar
Welde, M., Odeck, J. (2017). Cost escalations in the front-end of projects?empirical evidence from Norwegian road projects. Transport Reviews, 37(5), 612630.10.1080/01441647.2016.1278285CrossRefGoogle Scholar
Williams, T., and Samset, K. (2010). Issues in front-end decision making on projects. Project Management Journal, 41(2), 3849.10.1002/pmj.20160CrossRefGoogle Scholar
Williams, T., and Samset, K. (2012). Project governance: Getting investments right. Palgrave Macmillan.10.1057/9781137274618CrossRefGoogle Scholar
Williams, T., Vo, H., Samset, K., and Edkins, A. (2019). The front-end of projects: a systematic literature review and structuring. Production Planning and Control, 30(14), 11371169.10.1080/09537287.2019.1594429CrossRefGoogle Scholar
Williams, T., Samset, K., and Volden, G. (2022). The front-end of large public projects: Paradoxes and ways ahead. Routledge.10.4324/9781003257172CrossRefGoogle Scholar
Wynn, C., Smith, L., and Killen, C. (2021). How power influences behaviour in projects: A theory of planned behavior perspective. Project Management Journal, 52(6), 607621.10.1177/87569728211052592CrossRefGoogle Scholar
Youker, R. (1989). Managing the project cycle for time, cost and quality: lessons from World Bank experience. International Journal of Project Management, 7(1), 5257.10.1016/0263-7863(89)90055-0CrossRefGoogle Scholar
Zheng, J., Roehrich, J. K., and Lewis, M. (2008). The dynamics of contractual and relational governance: Evidence from long-term public-private procurement arrangements. Journal of Purchasing and Supply Management, 14(1), 4354.10.1016/j.pursup.2008.01.004CrossRefGoogle Scholar
Zwikael, O., and Meredith, J. (2019). The role of organizational climate in setting project goals. International Journal of Operations and Production Management, 39(12), 12811294.10.1108/IJOPM-02-2019-0150CrossRefGoogle Scholar

Accessibility standard: WCAG 2.0 A

Why this information is here

This section outlines the accessibility features of this content - including support for screen readers, full keyboard navigation and high-contrast display options. This may not be relevant for you.

Accessibility Information

The PDF of this book conforms to version 2.0 of the Web Content Accessibility Guidelines (WCAG), ensuring core accessibility principles are addressed and meets the basic (A) level of WCAG compliance, addressing essential accessibility barriers.

Content Navigation

Table of contents navigation
Allows you to navigate directly to chapters, sections, or non‐text items through a linked table of contents, reducing the need for extensive scrolling.
Index navigation
Provides an interactive index, letting you go straight to where a term or subject appears in the text without manual searching.

Reading Order & Textual Equivalents

Single logical reading order
You will encounter all content (including footnotes, captions, etc.) in a clear, sequential flow, making it easier to follow with assistive tools like screen readers.
Short alternative textual descriptions
You get concise descriptions (for images, charts, or media clips), ensuring you do not miss crucial information when visual or audio elements are not accessible.
Full alternative textual descriptions
You get more than just short alt text: you have comprehensive text equivalents, transcripts, captions, or audio descriptions for substantial non‐text content, which is especially helpful for complex visuals or multimedia.
Visualised data also available as non-graphical data
You can access graphs or charts in a text or tabular format, so you are not excluded if you cannot process visual displays.

Visual Accessibility

Use of colour is not sole means of conveying information
You will still understand key ideas or prompts without relying solely on colour, which is especially helpful if you have colour vision deficiencies.
Use of high contrast between text and background colour
You benefit from high‐contrast text, which improves legibility if you have low vision or if you are reading in less‐than‐ideal lighting conditions.

Save book to Kindle

To save this book to your Kindle, first ensure no-reply@cambridge.org is added to your Approved Personal Document E-mail List under your Personal Document Settings on the Manage Your Content and Devices page of your Amazon account. Then enter the ‘name’ part of your Kindle email address below. Find out more about saving to your Kindle.

Note you can select to save to either the @free.kindle.com or @kindle.com variations. ‘@free.kindle.com’ emails are free but can only be saved to your device when it is connected to wi-fi. ‘@kindle.com’ emails can be delivered even when you are not connected to wi-fi, but note that service fees apply.

Find out more about the Kindle Personal Document Service.

Available formats
×

Save book to Dropbox

To save content items to your account, please confirm that you agree to abide by our usage policies. If this is the first time you use this feature, you will be asked to authorise Cambridge Core to connect with your account. Find out more about saving content to Dropbox.

Available formats
×

Save book to Google Drive

To save content items to your account, please confirm that you agree to abide by our usage policies. If this is the first time you use this feature, you will be asked to authorise Cambridge Core to connect with your account. Find out more about saving content to Google Drive.

Available formats
×