No CrossRef data available.
Published online by Cambridge University Press: 07 May 2025
Since the 9.0 quake and tsunami struck Japan on March 11 and the situation at the Fukushima Dai-ichi power plant rapidly degenerated, Fukushima residents and politicians, those most afflicted by the current crisis, have criticized the lack of information provided by TEPCO (Tokyo Electric Power Company) and the government. Prefectures with a concentration of nuclear power plants like Fukui and diverse citizens' groups have also sounded off, condemning the lack of information and delay in releasing critical facts to the public. A particular concern is that the government initially left far too much up to the company, was slow in establishing a headquarters to coordinate joint response, and initially accepted TEPCOs vague description of the situation and assurances, many of which have since turned out to be suspect.
Between 2012 and 2014 we posted a number of articles on contemporary affairs without giving them volume and issue numbers or dates. Often the date can be determined from internal evidence in the article, but sometimes not. We have decided retrospectively to list all of them as Volume 10, Issue 54 with a date of 2012 with the understanding that all were published between 2012 and 2014.' As footnote