Stable and efficient blast furnace operation with high PCIand low coke rate at Arcelor Mittal Flat Carbon W-Europe

Published online by Cambridge University Press:  22 May 2007

Get access

Abstract

Coke production capacity within AM FCWE is not self sufficient for the total HM production. PCI was started up in 2004 at Bremen BF2 and Eisenhüttenstadt BF5, with a ramp up to 180 kg/thm in one year. A working group defined the BF operating conditions leading to stable and efficient operation at high PCI. At Florange BF3 PCI trials at 220 kg/thm were successful. At Dunkerque BF4 and Gent BFA and B, the PCI rate exceeds regularly 210 kg/thm.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2007

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)