Hostname: page-component-848d4c4894-wzw2p Total loading time: 0 Render date: 2024-06-03T14:08:48.013Z Has data issue: false hasContentIssue false

Emergency repair of the hearth wall of BF A at Aceralia

Published online by Cambridge University Press:  27 April 2006

Get access

Abstract

Aceralia blast furnace A suffered a 28-days emergency repair in September 2004, due to accelerated wear of the hearth walls and severe damage of the cast iron staves at the bosh area. Considering the shortage of supplies, Aceralia resorted to non conventional repair methods in order to prolong the campaign by one year, until full relining: small format carbon bricks and carbon ramming mass for the hearth and tapholes and steel staves at the bosh.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2006

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)