Hostname: page-component-6766d58669-bp2c4 Total loading time: 0 Render date: 2026-05-22T07:37:33.876Z Has data issue: false hasContentIssue false

Multivariate phenomenological models for real-time short-term forecasts of hospital capacity for COVID-19 in Belgium from March to June 2020

Published online by Cambridge University Press:  17 December 2021

M. H. Nguyen
Affiliation:
Data Science Institute (DSI), I-BioStat, Universiteit Hasselt, BE-3500 Hasselt, Belgium
T. Braeye
Affiliation:
Department of Epidemiology and Public Health, Sciensano, BE-1050 Brussels, Belgium
N. Hens
Affiliation:
Data Science Institute (DSI), I-BioStat, Universiteit Hasselt, BE-3500 Hasselt, Belgium Centre for Health Economics Research and Modelling of Infectious Diseases (CHERMID), Vaccine & Infectious Disease Institute (VAXINFECTIO), University of Antwerp, BE-2000 Antwerp, Belgium
C. Faes*
Affiliation:
Data Science Institute (DSI), I-BioStat, Universiteit Hasselt, BE-3500 Hasselt, Belgium
*
Author for correspondence: C. Faes, E-mail: christel.faes@uhasselt.be
Rights & Permissions [Opens in a new window]

Abstract

Phenomenological models are popular for describing the epidemic curve. We present how they can be used at different phases in the epidemic, by modelling the daily number of new hospitalisations (or cases). As real-time prediction of the hospital capacity is important, a joint model of the new hospitalisations, number of patients in hospital and in intensive care unit (ICU) is proposed. This model allows estimation of the length of stay in hospital and ICU, even if no (or limited) individual level information on length of stay is available. Estimation is done in a Bayesian framework. In this framework, real-time alarms, defined as the probability of exceeding hospital capacity, can be easily derived. The methods are illustrated using data from the COVID-19 pandemic in March–June 2020 in Belgium, but are widely applicable.

Information

Type
Original Paper
Creative Commons
Creative Common License - CCCreative Common License - BY
This is an Open Access article, distributed under the terms of the Creative Commons Attribution licence (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted re-use, distribution and reproduction, provided the original article is properly cited.
Copyright
Copyright © The Author(s), 2021. Published by Cambridge University Press
Figure 0

Fig. 1. Epidemic curve in Belgium: number of new COVID-19 hospitalisations (red line), number of COVID-19 patients in the hospital (green line) and in the ICU (blue line).

Figure 1

Table 1. Summary characteristics of hospital load during the first wave of the COVID-19 pandemic in Belgium from 11 March 2020 until 6 Jun 2020

Figure 2

Fig. 2. Visualisation of growth models at different phases. Phase 1: exponential growth model; phase 2: logistic growth model; phase 3: logistic distribution model; phase 4: Richards model.

Figure 3

Fig. 3. 5-day ahead prediction for the number of new COVID-19 hospitalisations. The dots are observed data, where black and red ones correspond to calibration and prediction period, respectively. The line and envelope are posterior mean and 95% CI for models from phase 1 (purple), phase 2 (orange), phase 3 (green) and phase 4 (blue).

Figure 4

Fig. 4. Model estimates for maximum daily new hospitalisations, turning point, final size and fraction before turning point. The dot and line are posterior mean and 95% CI for models from phase 2 (orange), phase 3 (green) and phase 4 (blue).

Figure 5

Table 2. Model goodness of fit and prediction performance via sMAPE for the COVID pandemic in Belgium from March to June 2020

Figure 6

Fig. 5. 5-day ahead prediction for the number of new COVID-19 hospitalisations, patients in the hospital and patients in the ICU from the joint process. The dots are observed data, where black and red ones are corresponding to calibration and prediction period, respectively. The line and envelope are model fitted line and 95% CI from phase 1 (purple), phase 2 (orange), phase 3 (green) and phase 4 (blue). Column correspond to new hospitalisations (left), total number of patients in the hospital (middle) and number of patients in the ICU (right). Rows correspond to different prediction dates during the epidemic.

Figure 7

Table 3. Model goodness of fit and prediction performance via sMAPE for COVID pandemic in Belgium from March to June 2020 from the joint process

Figure 8

Fig. 6. 5-day ahead prediction for the number of new COVID-19 hospitalisations, patients in the hospital and patients in the ICU from the joint process. The dots are observed data, where black and red ones are corresponding to calibration and prediction period, respectively. The line and envelope are model fitted line and 95% CI from phase 1 (purple), phase 2 (orange), phase 3 (green) and phase 4 (blue). Column correspond to new hospitalisations (left), total number of patients in the hospital (middle) and number of patients in the ICU (right). Rows correspond to different prediction dates during the epidemic. Model estimates from the joint process for maximum daily new hospitalisations, turning point, final size, fraction before turning point and length of stay in the hospital and ICU. The dots and lines are posterior means and 95% CI for models from phase 1 (purple), phase 2 (orange), phase 3 (green) and phase 4 (blue), respectively.

Figure 9

Fig. 7. Model prediction for hospital and ICU exceedance probability on day 5 ahead from univariate process (top) and joint process (bottom). The dots are posterior means for models from phase 1 (purple), phase 2 (orange), phase 3 (green) and phase 4 (blue), respectively.

Supplementary material: File

Nguyen et al. supplementary material

Nguyen et al. supplementary material

Download Nguyen et al. supplementary material(File)
File 2.9 MB