Hostname: page-component-54dcc4c588-m259h Total loading time: 0 Render date: 2025-10-04T06:51:19.533Z Has data issue: false hasContentIssue false

The Buildings at Risk Register for Scotland Online

Published online by Cambridge University Press:  06 June 2016

Duncan Chappell*
Affiliation:
Scottish Civic Trust, Tobacco Merchant’s House, 42 Miller Street, Glasgow G1 1DT, UK
*
Email: duncan.chappell@scottishcivictrust.org.uk, www.buildingsatrisk.org.uk
Get access

Abstract

The Buildings at Risk Register for Scotland provides information on around 1250 buildings of architectural or historic merit that are considered to be at risk. Ranging from large baronial castles to small vernacular farmhouses, or from former factories to redundant churches, all represent considerable restoration opportunities. Established in 1990 by the Scottish Civic Trust on behalf of Historic Scotland, the Register was the first of its kind in the UK and is now emulated nationally. In April 2004, the Scottish Civic Trust embarked upon an exciting new chapter with the launch of www.buildingsatrisk.org.uk.

Information

Type
Research Article
Copyright
Copyright © The Art Libraries Society 2004

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

Article purchase

Temporarily unavailable

References

1. The Scottish Civic Trust is Scotland’s leading independent organisation promoting excellence in the nation’s built environment. It exists to provide leadership and focus in the protection and enhancement of Scotland’s built environment, as well as challenging ideas and decisions, stimulating debate and encouraging new thinking.Google Scholar
2. Historic Scotland is an Agency of the Scottish Executive Education Department and is directly responsible to Scottish Ministers for safeguarding the nation’s built heritage, and promoting its understanding and enjoyment.Google Scholar
3. The Buildings at Risk Bulletin has appeared periodically since September 1990, with the latest Bulletin published in March 2004. To reflect the online availability of the Register, this Bulletin will be the last in the current format.Google Scholar