Hostname: page-component-89b8bd64d-j4x9h Total loading time: 0 Render date: 2026-05-06T11:49:58.886Z Has data issue: false hasContentIssue false

Stochastic Flow-Shop Scheduling with Lateness-Related Performance Measures

Published online by Cambridge University Press:  27 July 2009

Chung-Yee Lee
Affiliation:
Industrial and Systems Engineering DepartmentThe University of Florida Gainesville, Florida 32611
Chen-Sin Lin
Affiliation:
Industrial and Systems Engineering DepartmentThe University of Florida Gainesville, Florida 32611

Abstract

In this paper we consider stochastic flow-shop scheduling with reference to certain lateness-related performance measures. We show that for various assumptions on the distribution of job-processing times of a flow shop, certain scheduling policies following the stochastic analogy of the Earliest Due Date (EDD) rule yield optimal results.

Information

Type
Articles
Copyright
Copyright © Cambridge University Press 1991

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

Article purchase

Temporarily unavailable