Chapter 9 on siting and installation considers some of the key steps leading to the successful installation of a wind energy project, whether a single machine or large array. A section on resource assessment considers site wind measurements, the IEC Wind Classification system, and the measure-correlate-predict (MCP) procedure for establishing long-term characteristics at a prospective site. Array interactions are described in terms of energy loss and increased turbulence: empirical models are given for predicting both effects and wake influence is illustrated with field measurements from large and small arrays. The civil engineering aspects of project construction are examined, with description of different foundation types; simple rules are given for conventional gravity base design, with illustrations. The construction and environmental advantages of rock anchor foundations are described, and some examples given. Transport, access, and crane operations are discussed. The use of winch erection is illustrated with the example of a 50kW machine. The chapter concludes with a short summary of the necessary electrical infrastructure between a wind turbine and the external grid network.
Review the options below to login to check your access.
Log in with your Cambridge Aspire website account to check access.
If you believe you should have access to this content, please contact your institutional librarian or consult our FAQ page for further information about accessing our content.